The TSO 2020 project has published a Cost Benefit Analysis study. The overall objective of this activity is to assess the costs and benefits of a 300MW Power-to-Gas installation. This analysis is made both from a societal perspective (total value to the society) and from the perspective of a market party (project’s business case in the market environment).
The deliverable of this activity is composed of three reports:
Report 1: Power to Gas project’s value to society
Report 2: A description of the facility optimisation and contribution to local grid stability
Report 3: Business case and operational scheme of the Power to Gas project